Pars Tableau Projects

> Replacement and Implementation of 66 kV Cable and Route of KWPA Lines of Bandar Imam Petrochemical Complex Power Plant

Type of contract:

EPC

Employer:

Bandar Imam Petrochemical

Project status:

Under Execution

Country:

Iran

Province:

Khuzestan

Project consultant:

-

Project duration:

18 Months

ptgc-return-logo

Related projects

مهندسی، تامین تجهیزات، نصب، اجرا و راه اندازی نیروگاه خورشیدی با ظرفیت 40 مگاوات در مجتمع معدنی و صنعتی گل گهر در قالب EPC

Construction of the largest active solar power pla...

Project location: Kerman
ptgc-return-logo

Design, equipment supply, installation, and commis...

Project location: Kerman
ptgc-return-logo

Engineering, supply of goods, construction and ins...

Project location: Kerman
ptgc-return-logo

GIS Jahan Foolad Sirjan

Project location: Kerman
ptgc-return-logo

RTU Saadat Abad Project

Project location: Tehran
ptgc-return-logo

Phase 14 Project

Project location: Tehran
ptgc-return-logo

Persian Gulf Star Project

Project location: Hormozgan
توسعه پست 230/20 کیلوولت بیدبلند

Establishment of Substation 230/20 kV Bid Boland G...

Project location: Khuzestan
ptgc-return-logo

Procurement of goods, construction work, installat...

Project location: Khuzestan