Pars Tableau Projects

> Water supply projects and implementing 100 meters of pipe jacking 1200 mm Golgohar

Type of contract:

EPC

Employer:

Golgohar Mining and Industrial co

Project status:

Temporary delivery

Country:

Iran

Province:

Kerman

Project duration:

6 Months

پروژه بازیابی آب مجتمع گل‌گهر فاز 3

Related projects

ptgc-return-logo

Supply, construction, transportation, installation...

Project location: Khuzestan
عملیات اجرای بخشی از خط انتقال آب از قزل اوزن به مخازن اصلی شهر اردبیل

Water transmission line from Qezal Ozan to the mai...

Project location: Ardabil
عملیات احداث سد مخزنی شهید بروجردی

Shahid Boroujerdi Reservoir Dam construction opera...

Project location: Lorestan
احداث تصفیه­ خانه جامع پساب صنعتی پتروشیمی کارون

The construction of wastewater treatment plant for...

Project location: Khuzestan
ptgc-return-logo

Supply of equipment, construction and operation of...

Project location: Sistan and Baluchistan
ptgc-return-logo

Executive operation of route construction between ...

Project location: Sistan and Baluchistan
ptgc-return-logo

Complementary works of the pumping station and irr...

Project location: Lorestan
ptgc-return-logo

Karamabad Reservoir Dam and the water transfer lin...

Project location: West Azerbaijan
ptgc-return-logo

Executive operation of construction of transmissio...

Project location: Sistan and Baluchistan