Pars Tableau Projects

> Implementation of the reopening of the road and the implementation of the 88 km long road and steel pipeline for water transmission, the design of the water transmission system from the Sea of Oman to the industries of Isfahan province.

Type of contract:

EPC

Employer:

Isfahan water supply co

Project status:

Under Execution

Country:

Iran

Province:

Isfahan

Project consultant:

Zistab Consulting Engineers

Project duration:

7 Months

خط انتقال آب به صنایع اصفهان – 88 کیلومتر

Related projects

ptgc-return-logo

Supply, construction, transportation, installation...

Project location: Khuzestan
عملیات اجرای بخشی از خط انتقال آب از قزل اوزن به مخازن اصلی شهر اردبیل

Water transmission line from Qezal Ozan to the mai...

Project location: Ardabil
عملیات احداث سد مخزنی شهید بروجردی

Shahid Boroujerdi Reservoir Dam construction opera...

Project location: Lorestan
احداث تصفیه­ خانه جامع پساب صنعتی پتروشیمی کارون

The construction of wastewater treatment plant for...

Project location: Khuzestan
ptgc-return-logo

Supply of equipment, construction and operation of...

Project location: Sistan and Baluchistan
ptgc-return-logo

Executive operation of route construction between ...

Project location: Sistan and Baluchistan
ptgc-return-logo

Complementary works of the pumping station and irr...

Project location: Lorestan
ptgc-return-logo

Karamabad Reservoir Dam and the water transfer lin...

Project location: West Azerbaijan
ptgc-return-logo

Executive operation of construction of transmissio...

Project location: Sistan and Baluchistan